In general, the depth of a conduit duct bank shall be established by the bending radius of the largest conduit in the duct bank. Where the conduit stubs up, the concrete envelope shall extend at least 150 mm (6 inches) above grade and shall be sloped.Į. The top of the concrete envelope shall be located a minimum of 610 mm (24 inches) below grade.
#Concrete encased duct bank install
Do not install any portion of the duct bank in the 45° cone of deflection from the low point of foundations.ĭ. In general, underground conduits and duct banks shall be installed below sewer lines and other piping.Ĭ. The location of all underground runs shall be selected with consideration for future structural installations in the area.ī. Underground Installation Requirements Underground RoutingĪ.
#Concrete encased duct bank series
Excellerate MEA series products are manufactured in accordance with industry standards. Excellerate disclaims any and all liability for damages or injury resulting from improper installation, service, or being used improperly or for an improper purpose. Products that are used for unintended purposes could fail, resulting in severe personal injury or death. Do not use them for any purpose other than those described in this catalog. WARNING: All products in this catalog should be installed and serviced only as illustrated or described. All third party trademarks are the property of their respective owners. While every effort has been made to assure the accuracy of information contained in this catalog at the time of publication, Excellerate is not responsible for inaccuracies resulting from undetected errors or omissions. NOTICE: Excellerate reserves the right to change the specifications, materials, equipment, prices or the availability of products at any time without prior notice. Ganged 10′ and 20′ sections provide expedited installation.Standard configurations are spaced to accommodate medium voltage heat calculations.Durable cradling allows for jobsite conditions.Place the assemblies in the trench in the correct sequence and connect the sections together.

The sections are rebar reinforced and very robust so they can easily be shipped anywhere in the world. The straight section and Transitional section assemblies are both built ready to install in 10’ or 20’ sections and can be used in both direct bury and concrete encased applications. Compared to a traditionally built duct bank, our straight Duct Bank assemblies are installed up to 60% faster and our engineered to order (ETO) transitional duct bank assemblies are installed up to 90% faster. When you use our NEC compliant Excellerate Duct Bank solution, your workers are exposed to the Trench DANGER ZONE for much LESS time. According to many safety institutions trenching is one of the most dangerous activities in construction.